File #: 11-0284    Version: Name: Award of Oak St constructon contract - CP Richards
Type: General Item Status: Passed
File created: 4/19/2011 In control: Mayor and City Council
On agenda: 5/9/2011 Final action: 5/9/2011
Title: Approval for the Mayor and/or City Administrator to award a contract to CP Richards Construction for the Oak Street Streetscape project in the amount of $187,651.50. Presented by Steve Acenbrak, Director of Transportation
Attachments: 1. Copy of Bids Received ITB 11-083-B Oak Street
Title
Approval for the Mayor and/or City Administrator to award a contract to CP Richards Construction for the Oak Street Streetscape project in the amount of $187,651.50.
Presented by Steve Acenbrak, Director of Transportation
Body
Item Summary:
Invitation to Bid #11-083-B was issued and 20 bids were received with costs ranging from $187,651.50 to $480,621.38. CP Richards Construction was the lowest, responsive responsible bidder in the amount of $187,651.50.
 
The construction limits for this project are from Alpharetta St. (SR 9) to Bush Street for a total length of 570 feet. The construction consists of adding a five-foot brick sidewalk on the north side and a ten-foot multi-use trail on the south side. A reconstructed Oak Street will include new two-foot wide curb and gutter sections on both sides of the street along with a new overlay of asphalt. A four-foot landscaping strip will be added behind the curb and new decorative pedestrian lighting will be spaced along both sides of the street. In addition, there is a net reduction in the number of wooden utility poles and the new ones are taller to allow more vegetation at street level. All of the non-electrified (lower) utility lines will be buried as part of this streetscape.
 
Committee or Staff Recommendation:
On April 27, 2011 the Community Development and Transportation Committee recommended placing this Item on the May 9, 2011 Mayor and Council Agenda.
 
Financial Impact:
Funds in the amount of $54,565.57 are approved and available in the CDBG Grant account, Cost Center 7323G1, Account #541415 and funds in the amount of $477,925.77 are available in the General Fund account, Cost Center 7410CP, Account #541415, Project #06GRA004, Project Oak Street Streetscape - Phase I. Total available project funds are $532,491.34.
 
Presented by:
Steven D. Acenbrak, PE, LEED AP, Director of Transportation