Roswell, GA
File #: 09-0299    Version: Name: Sidewalk Connectivity
Type: General Item Status: In Department
File created: 4/15/2009 In control: Transportation Department
On agenda: 5/20/2009 Final action: 5/4/2009
Title: Approval to authorize the Mayor and/or City Administrator to sign a contract with Mulkey Engineering and Consultants to complete the design of three (3) Sidewalk Connectivity Projects in the amount of $61,154.10. Presented by Steve Acenbrak, Director
Title
Approval to authorize the Mayor and/or City Administrator to sign a contract with Mulkey Engineering and Consultants to complete the design of three (3) Sidewalk Connectivity Projects in the amount of $61,154.10.
Presented by Steve Acenbrak, Director
Body
Item Summary:
Design fees proposals were requested from two (2) of our professional services consultants to complete the sidewalk design and to provide construction plans for three (3) sidewalk sections: Canton Street @ Crabapple Road, Fouts Road @ Holcomb Bridge Road and Warsaw Road @ Roswell Creek apartments.  Mulkey Engineering had the lowest fee proposal of $61,154.10.
 
Committee or Staff Recommendation:
Staff recommends approval.
 
Financial Impact:
Funds in the amount of $520,470.23 are available in the Sidewalk Connectivity Program Account, Cost Center 4210CP, Account #541415, Project #06TRA001.
 
Presented by:
Steven D. Acenbrak, P.E., LEED AP, Director of Transportation