Roswell, GA
File #: 11-0354    Version: Name: Award of Marta sidewalk batch 1 to curbtech
Type: General Item Status: Passed
File created: 5/17/2011 In control: Mayor and City Council
On agenda: 6/13/2011 Final action: 6/13/2011
Title: Approval for the Mayor and/or City Administrator to sign a contract with CurbTech, Inc. for the construction of the MARTA Offset - Sidewalks Batch #1 Project in the amount of $133,302.50. Presented by Steve Acenbrak, Director of Transportation
Attachments: 1. marta sidewalks
Title
Approval for the Mayor and/or City Administrator to sign a contract with CurbTech, Inc. for the construction of the MARTA Offset - Sidewalks Batch #1 Project in the amount of $133,302.50.
Presented by Steve Acenbrak, Director of Transportation
Body
Item Summary:
Invitation to Bid #11-133-B was issued and twelve (12) bids were received with costs ranging from $133,302.50 to $256,090.50. CurbTech, Inc. was the lowest responsive, responsible bidder in the amount of $133,302.50.
This project consists of constructing sidewalks at four locations near MARTA bus routes to improve pedestrian safety and mobility. The four locations are:
1. The north side of Hembree Road, west of SR 9;
2. The north side of Mansell Place, east of SR 9;
3. The north side of House Way, east of Houze Road; and
4. Along the south side of Mansell Road, from just west of Roswell Commons Drive extending 1,500 feet to the east.
The total project will provide approximately 3,400 linear feet of 5-foot sidewalk.
 
Committee or Staff Recommendation:
On May 25, 2011 the Community Development and Transportation Committee recommended placing this Item on the June 13, 2011 Mayor and Council Agenda.
 
Financial Impact:
Funds in the amount of $691,866.40 are approved and available in the MARTA Offset - Pedestrian Improvements Grant Account, Cost Center 5540G1, Account #541415, Project #10TRA007.
 
Presented by:
Steven D. Acenbrak, PE, LEED AP, Director of Transportation