Legislation Details

File #: 13-0495    Version: 1 Name: 201303028, S.W. Corner of Holcomb Bride Rd./Scott Rd., Roswell Retirement Residence
Type: General Item Status: Passed
File created: 10/4/2013 In control: Design Review Board
On agenda: Final action: 11/5/2013
Title: 201303028, S.W. Corner of Holcomb Bridge Rd./Scott Rd.
Attachments: 1. Application, 2. Certification of Impact Fee, 3. Elevations, 4. Exterior lighting cut sheets, 5. Landscape Plans, 6. Letter of Intent, 7. Photo metric plan, 8. Reconnnaissance Survey-Aerial Plan-Photos, 9. Requirement for Fee Determination Letter, 10. Site Plan & Surveys, 11. Site section, 12. Resolution 201303028 Rosw. Retirement, 13. Revised elevations 11-5-13, 14. 201303028,Board approval emails, 15. Signed 11-5-13 DRB minutes
Title

201303028, S.W. Corner of Holcomb Bridge Rd./Scott Rd.

Body

Item Summary:

Site Development - New Construction

Staff Report:

The applicant is requesting to build a new retirement building and develop a vacant site.  The property was rezoned to O-P with a conditional use to allow for a retirement residence by the Mayor and City Council on September 23, 2013.  

Site Plan Analysis       

The site plan shows the location of the proposed buildings and site layout/circulation. The building will be three stories and approximately 116,000 square feet. Applicant is proposing 79 new parking spaces. There will also be various retaining walls.

Landscape Plan Analysis

The landscape plan proposes additions of Chinese Elm, Little Gem Southern Magnolia, Japanese Cryptomeria, Eastern Red Cedar, Laurel Oak, Crape Myrtle and Eastern Redbud as well as other shrubs and ground coverings.

The site is required to have 153.3 tree density units. The site currently has 207 units and the applicant is adding 24 density units.

Elevations       

The building will be a residential style with stone veneer for most of the first floor and mixed with hardi-plank siding on the second floor. The third floor will be a mix of the hardi-plank and shingle siding. The roof will be composite shingle and there will be balconies with aluminum railing.  

Applicant will bring color samples and building materials to the meeting.

Design Guidelines

The site is regulated by the City Wide Design guidelines.  

Department Comments       

Arborist: Coordinate Tree Density Calculations on Sheet L2-00 to reflect plant schedule on preliminary landscape plans: 87 trees/3 & 4 inch caliper: RDF = 48.7 units, therefore SDF = 255.7

Building: No comment for DRB, building plans required.

Engineering: Provide Retaining Wall types, details, materials, and heights for DRB approval.

Environmental: Approval of the concept does not imply approval of a design for stormwater ordinance c...