Legislation Details

File #: 13-0496    Version: 1 Name: 201303029, 990 Mansell Rd., Hennessy Porsche
Type: General Item Status: Passed
File created: 10/4/2013 In control: Design Review Board
On agenda: Final action: 11/5/2013
Title: 201303029, 990 Mansell Rd., Hennessy Porsche
Attachments: 1. Application, 2. Elevations, 3. Letter of Intent, 4. Site Plan-Layout, 5. Survey, 6. Resolution 201303029, Hennessey, 7. Signed 11-5-13 DRB minutes
Title

201303029, 990 Mansell Rd., Hennessy Porsche

Body

Item Summary:

Addition of parking deck and expansion of current structure

Staff Report:

The applicant is requesting to expand an existing building as well as add a four level parking deck with 159 inventory spaces.

Site Plan Analysis       

The site plans shows the size and location of the parking addition in the northwestern corner of the property and the building addition on the northeastern corner of the building.

Landscape Plan Analysis

The site plan shows the addition of European Hornbeam, Lacebark Elm, Red Maples and shrubbery to provide screening of the parking deck.

Elevations       

The building addition will match the existing building. The parking deck will be smooth finish concrete panels.

Applicant will bring color samples and building materials to the meeting.

Design Guidelines

The site is regulated by the City Wide Design guidelines.  

Department Comments       

Arborist: No comment.

Building: No comment for DRB, building plans required.

Engineering:

·      Provide Photometric Analysis, Lighting Standards and Luminere details and data with LDP application.

·      Provide 20 foot drainage easements and storm drainage pipes entering the site. It appears that the parking deck may encroach on these drainage system easements. Address at LDP phase.

·      Refresh landscape and trees to comply with previously approved landscape plans.

·      Provide performance analysis and/or maintenance records for pervious asphalt paving.

·      Provide most recent annual inspection report for stormwater facility.

·      How will stormwater be managed for this phase of development? (May increase limits of disturbance.)

Environmental:

·      Please provide the total amount of new or replaced impervious area for the proposed work.

·      Compliance to the stormwater ordinance appears to be required for this site. No proposals for providing stomrwater co...

Click here for full text